Leave Your Message
Products Categories
Featured Products

China Shooting Panel Suppliers - Intelligent Electric Safe Initiation System from Reliable Factory

The shooting panel is expertly engineered for firing electronic detonators and igniters safely during perforating operations. This high-quality product features a self-checking circuit, voice reminders, automatic earth leakage protection, and a time-out power-off function. As a leading manufacturer and supplier from China, our factory ensures that every shooting panel meets stringent safety standards and delivers reliable performance, making it an essential tool for industry professionals

    Product Description

    The shooting panel (Intelligent Electric Safe Initiation System) is specialized used as power supply for electric initiation (Electric Detonator, Igniter) as well as the DC power supply for magnetizing implement. By way of changing the position of the Wireline and the GND, we could also make the positive and negative current output respectively to achieve the purpose of initiation for twice.

    Isolation & Filter Technology: The power supply fulfills the large current of AC output with wide voltage range, and uses electronic isolation and current filter technology which effectively isolates the grid and voltage (preventing leakage protection switch tripping when initiating) while enhancing output voltage stability and antijamming capability for reliable operation.

    Over-Current Time-Delay Protection: Features an automatic protection circuit that automatically cuts off output when ignition duration reaches two seconds, shielding the control panel from breakdown.

    Safety Switch Integration: Used in concert with our Digital Electronic Explosion-proof Safety Switch, providing anti-static, anti-creep, and operator error prevention benefits. It overcomes the shortcomings of Mechanical Pressure Explosion-proof Safety Switches, preventing accidental ground detonations or pit perforations.

    Directions for Operation

    1
    Select the corresponding output voltage according to the detonator’s initiating voltage. If the length of the electric cable is more than 3000 meters, it is necessary to add an additional voltage of 10V~30V according to its length to ensure reliable initiation.
    2
    Connect the Wireline plug and GND correctly according to the operational requirements.
    3
    Turn on the power switch and safety switch successively, then push the Firing Switch button (for four seconds) when confirmed, and finally release the button when there is no output current.
    4
    Turn off the power switch and safety switch successively, then unplug the Wireline plug and GND plug. The initiation control panel should be placed in a safe position after the operation has been finished.

    Specifications

    Type Input Voltage
    (V)
    Output Voltage
    (V)
    Input Current
    (A)
    Output Current
    (A)
    Continuous Operation
    Time (s)
    Frequency
    (Hz)
    Temperature Rating
    (°C)
    HY-Ⅰ 220 280 ~ 400 1.8 ≤ 2A 5 50 ~ 60 -5 ~ 45
    HY-Ⅱ 350 ~ 450 3

    SAFETY WARNING: If you are not properly trained in the handling and use of explosive devices, do not attempt the assembly of any FYPE Perforating Systems or Firing Devices.

    Frequently Asked Questions (FAQ)

    1. What is the main purpose of the Intelligent Electric Safe Initiation System?
    It serves as a specialized power supply for electric initiation (electric detonators and igniters) as well as a DC power supply for magnetizing implements. It allows dual initiation capability by altering the positions of the Wireline and GND connections.
    2. How does the system prevent accidental tripping and power grid interference?
    The system utilizes advanced electronic isolation and current filtering technologies. This isolates the grid and voltage to prevent leakage protection switches from tripping during initiation, while enhancing output voltage stability and anti-jamming performance.
    3. What voltage adjustments are needed for long cable operations over 3000 meters?
    When using electric cables longer than 3000 meters, an additional voltage of 10V to 30V should be added based on the exact cable length to guarantee reliable initiation.
    4. What are the primary specification differences between Model HY-Ⅰ and Model HY-Ⅱ?
    Model HY-Ⅰ provides an output voltage of 280~400V with a continuous operation time of 5 seconds. Model HY-Ⅱ provides a higher output voltage of 350~450V with a continuous operation time of 3 seconds.
    5. How does the system protect the control panel from overload breakdown?
    The system is equipped with an over-current time-delay protection circuit that automatically cuts off the current output as soon as the ignition duration reaches two seconds.
    6. Who is authorized to operate or assemble this initiation equipment?
    Only personnel who are properly trained in the handling and use of explosive devices are authorized to assemble or operate FYPE Perforating Systems and Firing Devices.
    Request A Quote
    Need a Consultation? Contact Us 24/7
    Describe your specific request*
    bg-contact